Trevor Matuszewski 1975 Freeport Rd. North East,Pa. 16428 Phone: 779-400-5768 Email: tmates70@hushmail.com OBJECTIVE ¨
To obtain an engineering position that
will utilize my professional experience in telecommunication design and
project management SUMMARY OF PROFESSIONAL EXPERIENCE ¨
Nine years of experience as OSP Design
Engineer ¨
Three years of experience in a Supervisory
or Management position in the Telecommunication field ¨
Ten years of AutoCAD Drafting and
Design Experience ¨
Five years of experience as a Field
Engineer, and Construction Inspector SUMMARY OF SOFTWARE EXPERIENCE ¨
NexusWorx ¨
Arch GIS ¨
3-GIS ¨
BidMaster/EWO/Fireworks/Martins/ArchGIS:
(Century Link) ¨
CadTel ¨
Microstation V8.9 2006 ¨
Microstation/BST
CAD/OPEDS/OSPCM/Mapviewer/Mobile Mapping/EFACS/LFACS/OFEI/PACS/CLAS EDUCATION ¨
Sep 95-May 99 Indiana University Of
Pennsylvania 1011 South Drive Indiana, Pa. 15705 Degree Received:
Bachelor’s Degree in Telecommunications ¨
Sep 1990 – Jun.1993 Marshalltown Community
College 3700 South Center
Street Marshalltown, IA 50158/
Ph: 1-866-622-4748 Course of Study:
Associates Degree in Engineering Technology CERTIFICATES ¨
Project Management
Certification,(AT&T) 2008 ¨
Field Construction Safety Trainer(North
Carolina Safety Council) 2001 PROFESSIONAL EXPERIENCE ¨ 04/2015 to
Present Black N Veatch: Lead
Engineer
AT&T West Coast FTTx A.
Project1.
Hire a team of OSP Engineers to tackle AT&T’s Fiber to the Node project,
serving Residential and business customers. Q.C. the final product of that
team, then submit to AT&T for approval. Hire Field Engineers to perform
make ready, and field design of Fiber Backbone. Make field visits on crews
progress, and troubleshoot any existing problems in the design. Price
OSP Engineer jobs then submit to all interested parties in Black N Veatch and
AT&T. Train new engineers on OSP Symbols, and understanding of
Construction drawings. B.
Project2.
Q.C. KIH Kentucky Fiber Project Engineering Drawings. Ensure Engineers are
adhering to the Construction and Design Guidelines set forth by the State of
Kentucky. Inspect Underground, buried, Aerial prints for strict OSP
Engineering standards. C.
Project
3. Google Fiber. Construction Ride Out. Receive Design Prints from Google.
Walk all of the HUT, FDP, Vault, FAP Locations to ensure the constructability
of the Design. Make Changes to the drawings on Google proprietary
software (Weaver) and submit to Google for approval. ¨
Sep. 2014 – Jan 30, 2015CHC
Consulting, LLC./Google ContractCarlsbad, CA ¨
OSP QA Engineer – QA Buried and Aerial outside plant fiber optic
cable systems for FTTH (Fiber-To-The-Home). QA FTTH (Fiber-To-The-Home) with
emphasis of verifying placement of fiber optic cables, fiber distribution
cabinets, fiber drop cables and fiber pair terminals to support LU’s (Living
Units). Aerial QA includes verifying cable path on pole line, span
lengths and identify ownership of poles (to include size and class). Buried
and Underground QA includes cable path in right-of-way and/or utility
easement. Identification of existing buried plant includes Telephone
Pedestals, Power Transformers, CATV pedestals and significant landscaping
obstacles, etc. Identification of existing utilities (to include Water, Gas,
etc.). Identify all problems and discuss with project manager and Engineering
design firm as needed. All work orders are
QA’d using 3GIS software along with Asbuilts and Redlines. ¨
Mar. 2014 – Sep. 2014RJE/CenturyLink
ContractEastern Indiana/Western Ohio ¨
OSP Engineer-Wire Center Engineer – Wire Center Engineer for Jay, Franklin, Dearborn,
Jefferson, Union, Randolph, and Rush Counties, Indiana. Duties
included; Design Fiber to the Cell tower sites, design GPON: Gigabit Passive Optical
Network for the City
Government Of Portland,In. High speed Backbone Networks, Design Dark Fiber
jobs for multiple customer locations, Damaged Pole jobs, The placement of
Fiber Jumpers and Patch panels for DSLAMS. Fiber to the Antenna(Distributed
Antenna Systems.)Buried pedestals new services to business and residential
customers, Worked on Joint Pole agreements between century Link and Power
company. Held orders, Road moves exceeding fifteen miles, involving Re-location
of Buried Copper, buried Fiber, Aerial Copper, and Aerial Fiber.
Planning and placement of new plant locations, removing old drops placing new
ones. Tracking special circuits, and relocating them, Using Byers (EWO) and
Map Viewer ¨
All Drawings were drafted using EWO. ¨
Jul. 2013 – Mar. 2014Treese
Communications/Cincinnati Bell ContractCincinnati,Oh ¨
OSP Design Engineer – Collect field notes for Buried and Aerial
designs. Buried field notes includes Telephone Pedestals, Power Transformers,
CATV pedestals and significant landscaping obstacles, etc. Identification of
existing utilities (to include Water, Gas, etc.). Coordinate with Power
Company if new power is required for equipment. Indicated ownership of
existing conduit. Aerial field notes includes cable path on pole line, span
lengths and identify ownership of poles (to include size and class). Design
and draft Underground and Aerial Fiber Optic Cable Systems with emphasis of
placing fiber optic cables, LGX and fiber drop cables. Record all
addresses in the area to receive service, Record number of units at each
address, either MDU’s or SFU’s, Identified all problems with jobs and discuss with
Lead Engineer and others as needed. Validate and encode project after
drafting is complete. Price and route project for approval after successfully
encoding project. ¨
All drawings were drafted utilizing
NexusWorx Fiber Management System. (GIS Based Software) ¨
Dec. 2012 – Feb 2013
BB Com/Frontier CommunicationsSycamore,Il. OSP
Design Engineer – Design and draft
Buried and aerial outside plant fiber optic and Copper cable systems for
FTTCS (Fiber-To-The-Cell-Site) and Copper from the Central office to the DLC
for various distribution areas. Collected field notes for Buried and Aerial
designs. Buried field notes include Telephone Pedestals, Power Transformers,
CATV pedestals and significant landscaping obstacles, etc. Identification of
existing utilities (to include Water, Gas, etc.). Design Delayed
service Order Projects such as: Damaged Poles, New
residential services,CWDM(Conventional Wavelength Multiplexing,) rippling of
pairs to bring service to new areas. Temporary service to construction
trailers. Provide Copper Plant to Hospitals, new Restaurants and other
business ventures. Attained all permits, researched Right Of Way with county
states and city records. ¨
All drawings were drafted utilizing
CadTel. (Based on AutoCad) ¨
Jul. 2012 – Oct 2012 BB Com/Century
Link ContractMinneapolis, Mn. FTTP
Design Engineer – Design and draft
Buried and Aerial outside plant fiber optic cable systems for FTTP
(Fiber-To-The-Premise) and long haul fiber. Collect field notes for Buried
and Aerial designs. Buried field notes includes Telephone Pedestals, Power
Transformers, CATV pedestals, significant landscaping obstacles, etc.
Identification of existing utilities (to include Water, Gas, etc.). Indicated
ownership of existing conduit. Aerial field notes includes cable path on pole
line, span lengths and identify ownership of poles (to include size and
class). Receive Projected Construction proposals from
Century Links, Minneapolis planner. Make Pre-construction engineering
surveys of all planned routes. Make field sketches,
for the design of multiple underground and buried projects, consisting of
upgrading all of the areas X boxes to a new TA1148V Model, the placing of
conduit under interstate and state highways. ¨
All drawings are Hand Drafted then submitted
to Century Link for approval. ¨
Mar. 2012 – Aug. 2012Engineering
Associates/Cox CableOmaha, NE ¨
OSP Design Engineer – – Collected field notes for underground and
aerial Construction of Fiber Optic Cables. Underground field notes included
Cable TV Pedestals, Power Transformers, sprinkler systems (if visible),
significant landscaping obstacles, etc. Identification of existing utilities
(to include Water, Gas, etc.). Indicated ownership of existing conduit.
Aerial field notes included cable path on pole line, span lengths and
identify ownership of poles (to include size and class). Locate Telephone,
Power and CATV interfaces location on houses. Identified the orientation and
address of houses Design and hand draft Buried and Aerial outside plant fiber
optic cable systems for Cable Service (High speed Voice, Data, TV system) ¨
All drawings were hand drafted and sent
to the Cad unit for Drafting. ¨
Jul. 2010 – Jan. 2012Telatron SystemsErie,
Pa. OSP Project Manager – ,Responsible for Planning,coordinating, and
executing project plans. Ensure Technicians follow design as requested by
customer, Design Fiber to the antenna (Distributed Antenna Systems)keeping
track of crews billing, Ensure that deliverables are met on a weekly basis.
Coordinate field visits with Engineers to determine FDH (Fiber Distribution
Hub) locations for distribution work orders. Identify problems with
work orders and discuss with Design Engineers. QC distribution and feeder
work orders. Designed and drafted underground and aerial outside plant fiber
optic cable systems for FTTP (Fiber-To-The-Premise). Collected field notes
for Making changes on drawing where needed, keeping customer informed on
technical capabilities of existing structures, providing communications
equipment (VOIP SERVERS) and wiring for interbuilding, and
intrabuilding communications for specialized clients, such as GE Corp, Lords
Corporation, Penn State, Erie Campus, and Gannon University. This work
also required the design layout of routing schematics prior to work release
orders. ¨
All drawings were drafted utilizing
Microstation V8.9 2006 ¨
Jul. 2008 – Jun. 2010 Tellics
Inc./AT&T ContractCharlotte, NC ¨
FTTN Design Engineer – Conditioned Distribution cable pairs (F2 cables
pairs) to be used in conjunction with VRAD’s. Run Planet report for FTTN
conditioning spreadsheet. P-commit one Distribution cable pair per living
unit. P-commit living units in Met2. Verify Distribution cable pairs have
been p-committed by using PLANET. Software. Designed and updated existing
drawing in BST CAD, Removing Load Coils to include cutting out bridge
taps. Add spare cables to ensure all living units are assigned a Distribution
cable pair. Identified all problems with projects and discuss with Project
Manager and others as needed. ¨
All drawings were drafted utilizing
BSTCAD Jobs were priced using OSPCM. ¨
Sep. 2007 – Apr. 2008
Competent Staffing/AT&T
Contract
Louisville,Ky Light
Speed Design Engineer – Carry out loop make up on distribution area
designated for Project Light Speed starting with X-BOX and including all cable
counts from the Serving Area,Provided out of Mobile Map Viewer. Connect
to the AT&T and Planet website on the Information Data Base. Down load
the data on the identified, excluded addresses and any new terminals, not found
on the LFACS terminal reports. Open “MET2” and run program that collects
all data on identified serving terminals and cable pair counts, in the
distribution area. Locate SOP (ready access) locations on record plats.
Physically locate SOP terminal addresses in the field and trace drops to customer
addresses. Open
OPEDS (Micro Station CAD) and begin drawings new and existing facilities and
removals, as applicable. Assign pair counts to terminal addresses, Locate
and remove all bridge taps; show all work steps on drawing, including PLS and
DAVAR. Attach
finished MET2 output documents to drawing file in OPEDS.
Auto encode project from OPEDS to OSPCM and price job. Route job to
lead engineer for approval. Work with construction on as-builts; design all
maintenance requests in opeds for construction, handle Line Conditioning jobs
and Red Lines. ¨
All drawings were drafted utilizing BST
CAD, and Priced using OSPCM ¨
Mar 2007 - Sep 2007Ajilon
Telecom/Quest CommunicationsPhoneix,Az OSP
Engineer- Contract field engineer working with Rural Electrification
Administration standards for Quest Telecommunications Network Operations.
Duties: Design and layout of routine
work orders for residential facilities for buried and aerial plant. Collected
field notes for Buried and Aerial designs Buried field notes include
Telephone Pedestals, Power Transformers, CATV pedestals and significant
landscaping obstacles, etc. Identification of existing utilities (to include
Water, Gas, etc.). Indicated ownership of existing conduit. Aerial field
notes includes cable path on pole line, span lengths and identify ownership
of poles (to include size and class) Design and construction experience
includes work with fiber rings, fiber in the loop, fiber to the curb,
multiplexers, analog and digital pair gain, HDSL, special circuits, conduit,
joint use trench, Right of Way and easement work. ¨
Aug 2003 – Mar 2007Ajilon
Telecom/Century Link ContractShreveport, La ¨
FITL Design Engineer. Performed Site Surveys and collected field notes
of existing RT (Remote Terminal) sites to determine placement of ADSL
equipment (Miniram, Adjunct cabinet, etc.) for service to customer. Design
and drafted Fiber Cables and Composite Drops to include ASW (Aerial Service
Wire) and BSW (Buried Service Wire) and Final Cutting Lengths. Prepare
engineering drawings to include cabling details, pole line design, guying,
manholes/handholes and all other structures. Designed feeder F-1 and
distribution F-2 cable facilities using appropriate tools such as Martins,
Fireworks, etc. Collect field notes for Underground and Aerial Construction
of Copper Cable. Underground field notes included correct dimensions of
Right-Of-Ways, Edge of Pavements and sidewalks. Identified existing
Manholes/Handholes. Identified existing utilities (to include Water, Gas,
etc.). Indicated ownership of existing conduit. Aerial field notes included
corrected dimensions of Right-Of-Ways, Edge of Pavements and sidewalks.
Identified existing utilities (to include Power, Neutral, Telephone, CATV,
etc.). ¨
All drawings were drafted using
EWO/Martins/ Fireworks.. ¨
Jul. 2000 – Aug 2003First South
Utility ConstructionGreensboro,Nc ¨
Construction Inspector-Responsible for insuring adherence to engineering
specifications by construction work crews, both in house and sub-contractors,
as designed by AT&T for a fiber cable route running from Atlanta, GA.
Through Pennsylvania, Delaware and ending in Trenton, NJ. Collected field
notes for underground and aerial Construction of Fiber optic
cables. Underground
field notes included correct dimensions of Right-Of-Ways, Edge of Pavements
and sidewalks. Identified existing Manholes/Handholes. Identified existing
utilities (to include Water, Gas, sewer) Carried out regular and random,
on-site field inspections to assess work quality. Updated changes to the
construction route as changes occurred in the field. Responsible for Red
Lining Trained all crews in Confined space Entry, and company foreman in
competent person certification, excavation and tunnel
fortifications. Certified company tractor trailers for Highway Safety. All drawings were
drafted utilizing AutoCAD 98. ¨
June 1999 – Jul. 2000KMC TelecomAtlanta,
GA ¨
FTTP Design Engineer – Design and drafted underground and aerial outside
plant fiber optic cable systems for FTTP (Fiber-To-The-Premise). Collected
field notes for Underground and Aerial designs. Underground field notes
includes Telephone Pedestals, Power Transformers, CATV pedestals, sprinkler systems
(if visible), significant landscaping obstacles, etc. Identification of
existing utilities (to include Water, Gas, etc.). Indicated ownership of
existing conduit. Aerial field notes includes cable path on pole line, span
lengths and identify ownership of poles (to include size and class). Design
and drafted Underground Fiber Optic Cable Systems with emphasis of placing 4,
8 or 12 pair terminals to support LU’s (Living Units). Design and drafted
Aerial Fiber Optic Cable Systems with emphasis of placing 6 pair terminals to
support LU’s (Living Units). Identified all problems with jobs and discuss
with Lead Engineer and others as needed. ¨
All drawings were drafted utilizing
AutoCAD 1998. REFERENCES: ¨
Furnished upon request |
|
|
||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Languages: |
Languages |
Proficiency Level |
|
English |
Fluent |
|
|
|